< >
Mon 31 Jul 1916 To Sharpness Dock Co (H Waddy) Gloucester
The annual inspection of the canal shows that the bottom gates at Junction Lock require slight repairs, also the facing planks of the top gates at Shallow Lock ( 2 missing completely)