Thu 29 Jan 1920
To Canal Control Committee (S Preston)
London
Dredging from Wallbridge to Framilode (River Severn) excluding responsibility for portion dealt with by Sharpness Docks Co, is about 7 miles. Estimated tonnage of deposit last dredging in 1879, since when and up to 1914 regular maintenance including dredging with hand spoon dredger has been carried out as per details receipt details set out. I am trying to get a definite figure of the costs.