Letter to Stroud Urban District Council, Engineer & surveyor, Stroud, Thu 26 Jul 1945

< >

Thu 26 Jul 1945
To Stroud Urban District Council, Engineer & surveyor
Stroud

Summary

Stroud Joint Sewage. 1. Right over Canal Bank to be maintained during operations. 2. Float at crossings and Painswick Stream to be maintained. Wayleave payment waived if Board connect No.3 Wallbridge with the Sewer.

< >