Mon 13 Oct 1788
Basin at Cirencester, wall on the east to be rebuilt and bottom to have more clay
Collateral branch, rocky part to be lined with clay
Lord Eliot, drains to be cut on the back of the banks through his land.
Road over lining and wall at Coates end of tunnel to be stopped
William Large to finish boat immediately