Minutes, Tue 26 Feb 1839

< >

Tue 26 Feb 1839

Summary

Details of increased supply of water by erection of new steam engine. Possible use of waste water to irrigate Mr Gordon’s meadow.
Repairs to canal proposed-
Mud to be removed from pond below Siddington and erection of lower gates, repairing cills of some of locks near Daneway and Tunnel, ascertaining state of Summit level and repairing defects near Cox’s Valley or Smerrill.

< >