Tue 12 Jan 1875
To Henry Fallows, foreman
Eastington Yard
Instructions: the mud boat to take a few loads between Mr Marling's swing bridge and the next towards Ebley as a result of The Effort, the Ceres, the Rose Ann and one of Mr George Hayle's boats being detained; piling required between Dudbridge and double locks and opposite to Ford's saw mills; see Fords re a rail in the fence near their works..