Letter to Libby, New Mill, Stroud, Wed 23 Feb 1876

< >

Wed 23 Feb 1876
To Libby, New Mill
Stroud

Summary

Instructions on: the entrance stones level with the wash, rebuilding of the portion of the culvert about a yard from the entrance, repairs to the portion up to the Junction with the two branch culverts, the crown of the arch, the hole in the bed of the culvert near the Junction with the two branch culverts and no necessity to extend the new work more than a yard further. Continued ..

< >