Minutes Wed 9 Aug 1809

< >

Wed 9 Aug 1809

Summary

Ordered that the aqueduct at Ebley be repaired as soon as materials can be got ready. Also Lockham Bridge and the culvert at Walk Bridge be examined and repaired the first opportunity, and the banks on Mr Cambridge's land be raised where necessary.

Verbatim text

At a Meeting of the Committee of the Stroud water Navigation held at the Committee room at Walbridge on Wednesday the 9^th of August 1809
Present: Sir Samuel Wathen, Will^m Stanton, Joseph Grazebrook, Nath^l Jones, Henry Eycott.
Read the Minutes of the last meeting.
Ordered that the Aqueduct at Ebley be repaired as soon as material can be ready for the purpose. Also Lockham Bridge and the Culvert at the Walk Bridge be examined and repaired at the first opportunity, and the Banks on M^r Cambridge's Land be rose where necessary.
Adjourn'd this meeting to Monday the 18^th of September next at two o'Clock in the Afternoon at the Committee room at Walbridge.

< >