Tue 26 Feb 1811
William Beard reported that the wing wall of Saul Bridge is fallen down. Bridge to be repaired as soon as the season permits.
Some stone be procured for preparing lime for the repairs of the Navigation.
At a Meeting of the Committee of the Stroudwater Navigtation held at the Committee room at Walbridge on Tuesday the 26^th of February 1811
Present: James Tyers, Jos^h Grazebrook, Rowles Scudamore, Sam^l Wathen, Will^m Stanton, Tho^s Holbrow.
Read the Minutes of the last Meeting.
Will^m Beard reported that the Wing Wall of Sauls Bridge is fallen down. Ordered that the same be repaired as soon as the Season will admit.
Also that some Stone be procured as soon as possible for preparing Lime for the repairs of the Navigation.
Adjourn'd this Meeting to Monday the 8^th of April next at two o'Clock in the Afternoon at the Committee room at Walbridge.