Thu 20 Dec 1877
To Henry Fallows, foreman
Eastington Yard
Arrangements to meet at Dudbridge top lock and travel up to Hilly Orchard Bridge which will be locked up on Sundays. Complaint about culvert this side of Saul Bridge not taking the water. New workman’s boat ordered. Wall at Eastington now rebuilt to 3’ 6’’ high