< >
Mon 17 Nov 1879 To Sharpness Dock Co (W B Clegram) Saul Lodge
I intend to dredge the canal to Framilode if the dredger can be worked and weather permits. We have taken out up to Saturday 15,130 tons at 6 1/2d per ton.