Letter to Henry Fallows, foreman, Eastington Yard, Wed 22 Aug 1883

< >

Wed 22 Aug 1883
To Henry Fallows, foreman
Eastington Yard

Summary

Request to call on Mr Savage Road Surveyor to tell him that the question of the drain at Dudbridge was brought before the Committee. No connection is to be made with the Canal. There was a small catch pit to catch all the gravel and sand before Mr Harper built the 2 cottages. If 9 inch pipes are put in direct to the canal it will not be long before trade is stopped in that narrow point of the canal. Visit to be arranged.

< >