Wed 28 Jul 1943
It was reported that Shallow Lock Bridge had been repaired, Saul Swing Bridge to be repaired next month.
RAF to receive an account for boats moored amounting to £12 10s for the quarter. Noted that a second quarter mile of waterway had been entered on 1 July.
[1943 July] Committee Meeting held at Wallbridge on Wednesday the 28^th day of July 1943 @ 3 o'clock pm
Present: W R Bloxam, Henry R Hooper, R J C Little, G A Evans, G W Morton Ball.
The Memoranda of the proceedings held on the 19^th May and 16^th June 1943 were confirmed.
Swing Bridges - Repairs
The Clerk reported the completion of the repair of the Shallow Lock Bridge, and that the repair of the Saul Swing Bridge would be undertaken next month.
Canal at Framilode, Stop Gate, Ministry of Transport
There was nothing to report.
Leicester Lovell & Company Ltd, Water Supply
The Chairman stated hat draft Agreement had been sent and the Navigation were awaiting a further letter from Messrs Leicester Lovell.
Canal at Whitminster, RAF
In accordance with Minute of last Meeting a letter had been written to Flight L^t Fox, nor reply had been received thereto. The Committee, in view of the number of boats, directed that an A/c should be sent in for the Quarter ending 30^Th June amounting to £12..10..0 for the use of the Canal from the Junction to Walk Bridge. It was noted that the RAF had entered in the second quarter of a mile of waterway on the 1^st July.
Severn Fishery Board, Angling
In accordance with Minute of last
To 236
Minute continued in page 236 https://stroudwaterhistory.org.uk/document/8184/.